Since November we have been working every Saturday in the interior of the service building. Around 350 square metres of joints are plastered, sanded, wallpapered and painted by the staff themselves in order to lay the floor afterwards. Here the term “dust” can be experienced physically and overhead work is sensually felt. The right job for the common pencil pusher!
1 comment
You may also like
A storage container provides space
It was slowly getting cramped in our service building. Many telescopes and telescope mounts as well as chairs for the seminar room were in the way at important places. This has now been remedied. The company Säbu from...
3. May 2024
Public spectroscopy forum
We not only want to take beautiful photos but also do astrophysics. This is done by physically analysing light using spectrographs. We offer an open spectroscopy forum for those who are interested in astrospectroscopy...
7. March 2024
Spectacular discovery
We have been observing the weather at the observatory for a few weeks now and were completely surprised to discover that there are long periods of rain. After intensive discussions, we came to a clear conclusion:...
26. February 2024
I’d like to give my hands into this great work, but I am too far away 🙁 Anyhow when I see the observatory has been having new appearance, I feel so happy.